DISCLAIMER
In case of interpretation or translation misleading, the Italian version will prevail.
DURATION
2 days
DATES
1-2 December 2025
TIME TABLE
9.00 – 14.30
PARTICIPATION FEE euro 660.00 + VAT (the fee is exempt from VAT if paid by public bodies)
SPEAKERS
Councillor Renato Catalano
Councillor of the Court of Auditors
Dr. Ilario Sorrentino
Director of ANAC
INTRODUCTION
The new code introduces “preceptive” principles such as that of the result, trust and access to the market, which have immediate operational value and replace rigid and sometimes contradictory rules. They also have value in the executive phase. This phase also plays a central role in relation to the numerous responsibilities that derive towards all the operators involved in the light of the discipline provided by the new Code, and in this sense the ANAC has identified critical aspects, also for anti-corruption purposes. The course aims to illustrate all the main and peculiar moments of the executive phase of public contracts, which begins with the signing of the negotiation deed and ends with the final verification activities, highlighting the differences compared to the contractor selection phase.
PROGRAM
- The system of principles of the new Code also valid in the execution phase.
- The execution requirements and the relevance in the tender and in the contract stipulation phase
- The generalization of the institute of contractual advance; the methods of integration and recovery.
- The delivery of the works and the start of the contract: early execution.
- The course of the terms for the fulfillment of the services: the reconstruction of the penalties and of a system of anticipatory damages calibrated on the individual contract and the individual service.
- Contract changes in progress.
- Subjective changes
- Objective changes; case studies: qualitative and quantitative limits.
- Price revision.
- Variations and communications to ANAC.
- Extensions and renewals.
- The mandatory fifth.
- Execution through subcontracting.
- Subcontracts and sub-contracts.
- Anti-mafia checks and authorization: distinction of the different aspects.
- The subcontractors’ points license
- The contractor’s requests: reservations and their management by the works manager and the RUP
- Notes on the amicable agreement Notes on the role of the Technical Advisory Board Completion of services.
- Payments to the contractor and traceability Replacement interventions in favor of workers
- Verification of conformity and regular execution.
- Testing
ISSUE OF CERTIFICATE OF ATTENDANCE AND PROFIT
CEIDA, an entity accredited by the Lazio Region as a provider of activities for Higher and Continuous Education, (accreditation obtained with Determination of the Director of the Regional Dir. “Training, Research and Innovation, School and University, right to study” no. G16019 of 23/12/2016, published in the B.U.R.L. no. 2 of 5/1/17), certifies, for each participant, the characteristics of the training course and how much of it was actually attended, by issuing certificates of attendance subject to passing a final test carried out using a multiple-choice questionnaire.
Course Features
- Lecture 0
- Quiz 0
- Duration 2 days
- Skill level All levels
- Language italian
- Students 7
- Assessments Yes